Highway Care are pioneers in highway safety and security solutions; enhanced by great people, creativity and innovation to deliver sustainable growth.
Our Operational Delivery Services, customer services, commercial and engineering teams offer support to every aspect of your project, for a completely seamless journey.
Read our latest updates about what we are doing and events we are hosting or attending.
We were thrilled to learn that the FALCON ACLM won the Highways Awards 2021 “Industry Product of the Year Highways Award”, along with our collaborative project...
4 February 2022 Innovation | Collaboration |
An automatic taper which can close off lanes in minutes and saves road workers having to put out cones in the face of oncoming traffic...
Read about our latest projects and detailed information of how we work with our associates.
4 February 2022 | Case study
A bespoke Hostile Vehicle Mitigation (HVM) barrier and security fence system from Highway Care and Fernden Construction is one of the features being installed around...
4 February 2022 | Case study
Partner: Littlewoods Fencing Ltd Location: North Horley Eastern Access Road. Live Dates: 26th April – 5th May 2021 Product: Tertu TimberRail Project Background: The new North...
4 February 2022 | Case study
Client: Highways England Contractor: Balfour Beatty Location: M20 J 8- 9, Moveable Barrier Project Project value: £55.1 million Live dates: Summer 2020 – December 2020, with final enhancements starting in 2021...
4 February 2022 | Case study
Client: Highways England Contractor: Balfour Beatty Location: A2 Bean Interchange Dates: Phase 1: April 2020 – June 2021, Phase 2: July 2021 – ongoing Product: BG800 Project Overview The Bean and Ebbsfleet...
4 February 2022 | Case study
Client: TMO Highways, BAM Farrans Location: Great Yarmouth town centre Live dates: March 2021 – September 2021 Product: BG800 and fence Project Background Works were planned for a...
4 February 2022 | Case study
A collaboration between Highway Care and Volker Highways has helped keep highway workers safe while working on essential repairs to the Queen Elizabeth Bridge in...
4 February 2022 | Case study
The Amberon Peterborough Depot has successfully trialled the Instaboom Incursion Gate. Instaboom was used on the Bretton Park Way resurfacing scheme in Peterborough. Works access...
4 February 2022 | Case study
Project Overview Phase 1 of the A309 project started in March 2021 and involved upgrading the existing barrier in the central reservation on the Kingston Bypass to...
4 February 2022 | Case study
Motorists at a busy junction on the A3 High Speed Red Route have now been protected against the road sign hazards within the wide junction...
4 February 2022 | Case study
Project Breakdown: The performance of non-proprietary, or untested, steel guardrail systems has been observed and commented on by many sources within the Middle East with...
4 February 2022 | Case study
Project Breakdown: Raptor® is used where light gantries are identified as being in substantial risk locations through the road design process or where a...
4 February 2022 | Case study
Project Breakdown: A temporary steel barrier system from Highway Care has recently been deployed in a major highways project in Western Australia to ensure vehicle...
4 February 2022 | Case study
Project Breakdown As part of the Western Ring Road (M80) Upgrade Project in 2013, the carriageway required placement of a new barrier on the existing wide...
4 February 2022 | Case study
Project Breakdown: Client: A Cones Partner: Bevan Group Product: Impact Protection Vehicles fitted with SS90 LMCC and Light Arrows Project Background: A Cones commissioned a...
4 February 2022 | Case study
Project Breakdown Client: Aone+, Pass & Co UK Ltd, Versco Ltd Location: Tinsley Viaduct, Sheffield Project value: £7.5 million Duration: April 2019 – August 2019 Division and product: Road...
4 February 2022 | Case study
Project Breakdown Client: Roocroft Road Restraint Systems Location: A64, Yorkshire Date: June 2020 Product: Tertu TimberRail – TM18 4M N2 W5 system, 4m post spacing Located...
4 February 2022 | Case study
Project Breakdown Client: Kier Location: M20 Smart Motorway J 3-5 Live dates: June 2018 – March 2020 Product: GS6 Boom and Instaboom Project Breakdown Instaboom is quickly...
4 February 2022 | Case study
Project Breakdown Client: Balfour Beatty Location: Operation BROCK, Kent Duration: March 2019 – January 2020 Product: SoSec Vehicle Incursion Gate Scope of Work Operation Brock was designed...
4 February 2022 | Case study
Project Breakdown Client: Kier Location: M20 Smart Motorway J 3-5 Live dates: June 2018 – March 2020 Product: BG800 temporary barrier and crash cushions Project Background This...
4 February 2022 | Case study
Project Breakdown Client: Balfour Beatty Location: M3 Smart Motorway J 2 to 4a Live Dates: Jan 2015 – March 2017 Division and Product: Road Barrier Systems; BG800 temporary barrier,...
4 February 2022 | Case study
Highway Care’s Temporary Automated Speed Camera at Roadworks (TASCAR) system has been installed for the first time alongside BG800 temporary barrier, as a complete...
4 February 2022 | Case study
Highway Care have supplied TMO Highways with two bespoke, Red X, VLA Impact Protection Vehicles for use in their high speed division on a long-term...
4 February 2022 | Case study
Our Operational Delivery Services team have been busy installing 2.5km of BG800 barrier on the M56 Helsby J13 -14. Project Breakdown The project for Colas...
4 February 2022 | Case study
Mini Light Arrows (MLA) are a great way to draw attention to a smaller, traffic management or road maintenance contractor vehicle. The MLA is ideal...
4 February 2022 | Case study
Project Background The A14 Cambridge to Huntington improvement scheme has been a major project for Highways England, the UK’s biggest road upgrade in fact....
4 February 2022 | Case study
When emergency work was required to repair Clifton Bridge on the A52 in Nottingham, Highway Care were ready to take on the challenge to help...
4 February 2022 | Case study
Project Breakdown: ArmorWire™ was installed in 2014 on the 45km Salwa – Lusail Temporary Truck Route in Qatar. The Ashghal PWA needed a suitable barrier that would...
4 February 2022 | Case study
Project Breakdown Highway Care have been innovating to increase road user safety since 1976 and with no sign of slowing down, their BG800® barrier was utilised...
4 February 2022 | Case study
Project Breakdown Client: Balfour Beatty Vinci JV Location: M4 Smart Motorway J 3-12 Live dates: May 2019 – March 2021 Product: GS6 Boom and Instaboom Balfour Beatty...
4 February 2022 | Case study
Project Background When Priority TM approached Highway Care to help build a specially-made, shorter than usual, impact protection vehicle (IPV), with a lorry mounted crash...
Members of LCRIG are also provided with a Member Profile. This service provides each member with the opportunity to share their organisation’s details, job opportunities, news, videos and links to key information. Members are also able to request for LCRIG to facilitate communication between members and the wider highways community.